2013
Interiors
Get Set for Abu Dhabi Media [Ad Sports]
This project is the result of a big effort, with big time constraints, of all the professionals involved, from the conception to the implementation.
The overall space is defined by two “parabolic” stripes/walls that intersect in the middle, like an “embracement” each one of them represents a team by its coulour, that changes accordingly to the game on discussion.
The construction system is made of steel structure covered with translucent plexiglass and led lighting behind. The studio comprises two set’s for two programs, “KICK-OFF” and “GAME OVER”, and a central videowall for a standing up position.
Nuno Gusmão
Pedro Anjos
Giuseppe Greco
Eurostand
FG+SG
2013
Interiors
Get Set for Abu Dhabi Media [Ad Sports]
This project is the result of a big effort, with big time constraints, of all the professionals involved, from the conception to the implementation.
The overall space is defined by two “parabolic” stripes/walls that intersect in the middle, like an “embracement” each one of them represents a team by its coulour, that changes accordingly to the game on discussion.
The construction system is made of steel structure covered with translucent plexiglass and led lighting behind. The studio comprises two set’s for two programs, “KICK-OFF” and “GAME OVER”, and a central videowall for a standing up position.
Nuno Gusmão
Pedro Anjos
Giuseppe Greco
Eurostand
FG+SG